      玻璃鋼防腐管道安裝要求
      時間:2022-07-05  瀏覽:5724次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 亚洲韩国精品无码一区二区三区| 亚洲精品国产丝袜久久| av天堂久久天堂色综合| 日本a网| 亚洲一区二区人妻| 浦北县| 久久福利导航| 国产婷婷综合在线视频中文| 福利所导航| 久久av无码精品人妻系列果冻传媒| 极品一区二区三区水蜜桃| 99在线精品国自产拍不卡| 国产精品污www在线观看| 四虎永久在线精品免费视频观看| 成人免费午夜无码视频在线播放| 日韩精品久久久久久免费| 囯产精品一品二区三区| 极品国模无码国产在线观看| 91资源总站| 三级在线视频观看| 中文字幕人妻无码专区APP| 97无码免费人妻超级碰碰碰| 国产精品色内内在线观看| www婷婷| 久久视频这里只精品| 日本久久99成人网站| 亚洲系列无码专区偷窥无码| 日韩人妻无码精品久久免费一| 丁香五月婷激情综合第九色| 久久三级视频| 国产精品综合av一区二区国产馆| 日韩人妻精品中文字幕专区| 3p?在线| 国产性爱网站| 国产人伦精品一区二区三| 亚洲国语自产一区第二页| 亚洲va欧美va国产va综合| 亚洲av激情一区二区| 97香蕉久久国产超碰青草专区| 国产熟女内射oooo| 精品在免费线中文字幕久久 |